Overview
Subfloors, roof decks and wall sheathing all use 4 × 8 ft sheets (or 1220 × 2440 mm in metric countries). This calculator counts the sheets for a rectangular area.
Add a waste allowance for cuts around openings, roof edges and stair holes.
Worked examples
| Inputs | Result |
|---|---|
| UnitsImperial (ft, in)Area length (ft or m)20Area width (ft or m)12Sheet size4 × 8 ftWaste allowance (%)10 | Sheets needed: 9Area covered: 240 ft² (22.3 m²) |
Show 2 more examples
| UnitsImperial (ft, in)Area length (ft or m)30Area width (ft or m)24Sheet size4 × 8 ftWaste allowance (%)10 | Sheets needed: 25Area covered: 720 ft² (66.89 m²) |
| UnitsMetric (m, cm)Area length (ft or m)5Area width (ft or m)3.6Sheet size1220 × 2440 mmWaste allowance (%)10 | Sheets needed: 7Area covered: 18 m² (193.75 ft²) |
Sheets needed by area length
With the calculator's starting values, the sheets needed is 9. The table shows how it changes with the area length.
| Area length (ft) | Sheets needed |
|---|---|
| 10 | 5 |
| 12.5 | 6 |
| 15 | 7 |
| 17.5 | 8 |
| 20starting value | 9 |
| 22.5 | 10 |
| 25 | 11 |
| 27.5 | 12 |
| 30 | 13 |
Other inputs: Units: Imperial (ft, in) · Area width: 12 ft · Sheet size: 4 × 8 ft · Waste allowance: 10%. Change them in the calculator above for your own numbers.
How it works
Sheets = area ÷ sheet area, plus waste, rounded up to whole sheets.
The formula
| Sheet area | 32 ft² for 4 × 8, 40 ft² for 4 × 10, 2.98 m² for 1220 × 2440 mm |
Practical tips
- Stagger the end joints of floor sheathing by at least one joist.
- For a gable roof, calculate each roof face separately with the roofing calculator.
- Leave a ⅛ in gap between sheets for expansion.
Frequently asked questions
How many sheets of plywood for a 12 × 20 ft floor?
240 ft² ÷ 32 = 7.5, so 8 sheets before waste, or 9 with 10% waste.
Plywood or OSB?
Both work for sheathing and subfloors; the sheet count is the same.