Overview
A strip footing spreads the weight of a wall into the soil. Ordering the right amount of concrete matters: running short mid-pour leaves a cold joint, and over-ordering wastes money on a truck you have to pay for anyway.
Enter the total footing length, its width and depth, and a waste allowance. You get the volume in cubic yards and cubic meters, plus how many 60 lb or 80 lb premix bags it takes if you are mixing by hand.
Worked examples
| Inputs | Result |
|---|---|
| UnitsImperial (ft, in)Footing length (ft or m)20Footing width (in or cm)16Footing depth (in or cm)8Waste allowance (%)10 | Concrete needed: 0.72 cubic yards (0.554 m³)19.56 cubic feetPremix bags: 33 × 80 lb or 44 × 60 lb |
Show 2 more examples
| UnitsImperial (ft, in)Footing length (ft or m)60Footing width (in or cm)20Footing depth (in or cm)10Waste allowance (%)10 | Concrete needed: 3.4 cubic yards (2.596 m³)91.67 cubic feetPremix bags: 153 × 80 lb or 204 × 60 lb |
| UnitsMetric (m, cm)Footing length (ft or m)12Footing width (in or cm)50Footing depth (in or cm)25Waste allowance (%)10 | Concrete needed: 1.65 m³ (2.16 cubic yards)Premix bags: 98 × 80 lb or 130 × 60 lb |
Concrete needed by footing length
With the calculator's starting values, the concrete needed is 0.72 cubic yards. The table shows how it changes with the footing length.
| Footing length (ft) | Concrete needed (cubic yards) |
|---|---|
| 10 | 0.36 cubic yards |
| 12.5 | 0.45 cubic yards |
| 15 | 0.54 cubic yards |
| 17.5 | 0.63 cubic yards |
| 20starting value | 0.72 cubic yards |
| 22.5 | 0.81 cubic yards |
| 25 | 0.91 cubic yards |
| 27.5 | 1 cubic yards |
| 30 | 1.09 cubic yards |
Other inputs: Units: Imperial (ft, in) · Footing width: 16 in · Footing depth: 8 in · Waste allowance: 10%. Change them in the calculator above for your own numbers.
How it works
The footing is treated as a rectangular prism. Width and depth are converted from inches (or centimeters) to feet, multiplied by the length, and a waste percentage is added for uneven trenches and spillage.
The formula
| Length | Total run of footing in feet (or meters) |
| Width, Depth | Cross-section of the footing, converted to feet |
| Waste | Extra percentage for over-dig and spillage |
Practical tips
- Trenches are rarely perfectly square. Measure depth in several places and use the average.
- Ready-mix suppliers sell in quarter or half yard steps, so round the result up.
- An 80 lb bag of premix yields about 0.6 ft³; above roughly one cubic yard, a truck is usually cheaper than bags.
Frequently asked questions
How deep should a footing be?
Footings must sit below the local frost line and on undisturbed soil. Typical residential footings are 8–12 in thick and 16–24 in wide, but your local building code sets the minimum.
How many bags of concrete are in a cubic yard?
About 45 bags of 80 lb premix or 60 bags of 60 lb premix make one cubic yard (27 ft³).
Should I add waste for a footing?
Yes. 5–10% covers uneven trench bottoms, form bulges and the concrete left in the mixer or chute.