Overview
Round columns and deck piers are usually poured into cardboard form tubes. This calculator gives the concrete volume for one or many columns of the same size.
Pick imperial or metric units, enter the tube diameter, the height and the number of columns. The result includes premix bag counts for small jobs.
Worked examples
| Inputs | Result |
|---|---|
| UnitsImperial (ft, in)Column diameter (in or cm)12Column height (ft or m)4Number of columns1Waste allowance (%)10 | Concrete needed: 0.13 cubic yards (0.098 m³)3.46 cubic feetPer column: 3.14 ft³ (0.089 m³)Premix bags: 6 × 80 lb or 8 × 60 lb |
Show 2 more examples
| UnitsImperial (ft, in)Column diameter (in or cm)8Column height (ft or m)3Number of columns6Waste allowance (%)10 | Concrete needed: 0.26 cubic yards (0.196 m³)6.91 cubic feetPer column: 1.05 ft³ (0.03 m³)Premix bags: 12 × 80 lb or 16 × 60 lb |
| UnitsMetric (m, cm)Column diameter (in or cm)30Column height (ft or m)1.2Number of columns4Waste allowance (%)10 | Concrete needed: 0.373 m³ (0.49 cubic yards)Per column: 0.085 m³ (3 ft³)Premix bags: 22 × 80 lb or 30 × 60 lb |
Concrete needed by column diameter
With the calculator's starting values, the concrete needed is 0.13 cubic yards. The table shows how it changes with the column diameter.
| Column diameter (in) | Concrete needed (cubic yards) |
|---|---|
| 6 | 0.03 cubic yards |
| 8 | 0.06 cubic yards |
| 10 | 0.09 cubic yards |
| 12starting value | 0.13 cubic yards |
| 14 | 0.17 cubic yards |
| 16 | 0.23 cubic yards |
| 18 | 0.29 cubic yards |
Other inputs: Units: Imperial (ft, in) · Column height: 4 ft · Number of columns: 1 · Waste allowance: 10%. Change them in the calculator above for your own numbers.
How it works
Each column is a cylinder. Its volume is π × radius² × height; that is multiplied by the number of columns and the waste allowance.
The formula
| Diameter | Inside diameter of the form tube |
| Height | Height of concrete in each column |
| Columns | How many identical columns you are pouring |
Practical tips
- Include the part of the column below grade; piers often go 3–4 ft into the ground.
- A belled footing at the base adds volume. Calculate it separately and add it on.
- Brace tall form tubes before pouring so they stay plumb.
Frequently asked questions
How much concrete does a 12 in Sonotube take?
About 0.79 ft³ per foot of height, so a 4 ft tall 12 in tube needs about 3.1 ft³, or six 80 lb bags.
Is it diameter or radius?
Enter the diameter (the full width of the tube). The calculator halves it to get the radius.